{"id":26,"date":"2020-01-30T22:24:47","date_gmt":"2020-01-30T22:24:47","guid":{"rendered":"http:\/\/www.uspipelining.com\/blog\/?p=26"},"modified":"2020-01-30T22:28:13","modified_gmt":"2020-01-30T22:28:13","slug":"project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed","status":"publish","type":"post","link":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/","title":{"rendered":"Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019"},"content":{"rendered":"<p class=\"post-title entry-title\"><span class=\"posted-by\">BY <span class=\"reviewer\"><a href=\"http:\/\/trenchlesstechnology.com\/category\/news\" target=\"_blank\" rel=\"noopener noreferrer\">TRENCHLESS TECHNOLOGY STAFF<\/a> <\/span><\/span><span class=\"posted-on\">ON <span class=\"dtreviewed\"><time class=\"value-title\" title=\"2017-10-31\" datetime=\"2017-10-31T10:30:08-05:00\">OCTOBER 31, 2017<\/time><\/span><\/span><span class=\"cats\"><a href=\"https:\/\/trenchlesstechnology.com\/category\/applications\/rehabilitation\/pipe-relining\/\" target=\"_blank\" rel=\"category noopener tag noreferrer\">PIPE RELINING<\/a>,\u00a0<a href=\"https:\/\/trenchlesstechnology.com\/category\/project-year\/\" target=\"_blank\" rel=\"category noopener tag noreferrer\">PROJECT OF THE YEAR<\/a>,\u00a0<a href=\"https:\/\/trenchlesstechnology.com\/category\/applications\/rehabilitation\/\" target=\"_blank\" rel=\"category noopener tag noreferrer\">REHABILITATION<\/a><\/span><\/p>\n<div class=\"entry-content\">\n<div id=\"themify_builder_content-3394\" class=\"themify_builder_content themify_builder_content-3394 themify_builder\" data-postid=\"3394\">\n<div class=\"themify_builder_row module_row clearfix module_row_0 themify_builder_3394_row module_row_3394-0\">\n<div class=\"row_inner col_align_top\">\n<div class=\"module_column tb-column col-full tb_3394_column module_column_0 module_column_3394-0-0 last\">\n<div class=\"tb-column-inner\">\n<div id=\"text-3394-0-0-0\" class=\"module module-text text-3394-0-0-0 repeat \">\n<div class=\"post-container cf\">\n<div class=\"post-content-right\">\n<div class=\"post-content description \">\n<div id=\"tps_slideContainer_14733\" class=\"theiaPostSlider_slides\">\n<div class=\"theiaPostSlider_preloadedSlide\">\n<p><a href=\"http:\/\/uspipelining.com\/\" target=\"_blank\" rel=\"noopener noreferrer\">US Pipelining LLC<\/a> recently completed a major military project that included the cured-in-place-pipe (CIPP) rehabilitation of nearly 1,000 lf of 10-ft diameter storm water piping located beneath the airfield apron of the McGuire Air Force Base in Burlington, New Jersey. As confirmed through Insituform, this is the largest CIPP liner ever installed.<\/p>\n<p>\u201cWorking with our resin supplier, AOC, and our liner manufacturer, Manufactured Technologies Corporation (MTC), we were able to achieve something that, to the best of our knowledge, has never been attempted,\u201d states Gary Horwedel, general manager of US Pipelining, who has been involved in infrastructure rehabilitation and repair using trenchless technologies for more than 25 years.<\/p>\n<p><a href=\"https:\/\/trenchlesstechnology.com\/us-pipelining-completes-major-cipp-lining-project-mcguire-air-force-base\/\" target=\"_blank\" rel=\"noopener noreferrer\"><strong>RELATED: US Pipelining Completes Major CIPP Lining Project at McGuire Air Force Base<\/strong><\/a><\/p>\n<p>\u201cThis project involved infrastructure running beneath the airfield of an active Air Force base. The pipes were 22 ft below grade and measured 121-in. around. The installation took place on the airfield, over-the-hole, and with military transport planes buzzing at our backs,\u201d says Horwedel. \u201cThis was an incredible achievement.\u201d<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright wp-image-29 size-full\" src=\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg\" alt=\"McGuire AFB\" width=\"300\" height=\"336\" srcset=\"https:\/\/florida.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg 300w, https:\/\/florida.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2-268x300.jpg 268w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>The over-the-hole installation of 10-ft diameter CIPP liner is among the largest to have been successfully completed anywhere. Requiring more than a year of planning, sourcing, and logistics, the project involved support from the nation\u2019s premier suppliers to the industry.<\/p>\n<p>\u201cAt 121 in. in diameter, the liners were among the largest our facilities have manufactured,\u201d states Mark Wetzel, senior director, Manufactured Technologies Corp. (MTC), an Aegion company. \u201cOur design and manufacturing staff worked around the clock with the team at US Pipelining to ensure the liner materials and manufacturing specifications were met. This was a milestone for all involved.\u201d<\/p>\n<p>Since entering the pipe rehabilitation industry 25 years ago, US Pipelining LLC has gained recognition for its ability to offer highly specialized rehabilitation solutions to a vast array of clients including global Fortune 500 Companies, high-rise residential and commercial buildings and government agencies worldwide. A leader in CIPP trenchless technologies, US Pipelining continues to grow their government agencies portfolio that includes the U.S. Military, NASA, Fort Knox, Government of Mexico, Cayman Islands and numerous agencies throughout North America.<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<div class=\"post-container cf\">\n<div class=\"post-content-right\">\n<div class=\"post-content description \">\n<div id=\"tps_slideContainer_14733\" class=\"theiaPostSlider_slides\">\n<div class=\"theiaPostSlider_preloadedSlide\">\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-medium wp-image-30\" src=\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/DNeSyv4W4AAV7EX-500x500-1-300x300.jpg\" alt=\"McGuire AFB 2\" width=\"300\" height=\"300\" srcset=\"https:\/\/florida.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/DNeSyv4W4AAV7EX-500x500-1-300x300.jpg 300w, https:\/\/florida.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/DNeSyv4W4AAV7EX-500x500-1-150x150.jpg 150w, https:\/\/florida.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/DNeSyv4W4AAV7EX-500x500-1.jpg 500w\" sizes=\"auto, (max-width: 300px) 100vw, 300px\" \/>\u201cAs projects go, this was one of the more challenging with which we\u2019ve been involved,\u201d said Bill Moore, AOC product leader-CIPP resins. \u201cOur team was engaged from day one as we worked through the selection and formulation of the resin in order to meet both environmental and engineering specifications. The sheer size of the liners being installed required six tankers carrying over 240,000 lbs of resin to be transported to the base from our plant in Canada. The logistics and delivery of material was a critical component.\u201d<\/p>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<\/div>\n<p><!--more--><\/p>\n","protected":false},"excerpt":{"rendered":"<p>BY TRENCHLESS TECHNOLOGY STAFF ON OCTOBER 31, 2017PIPE RELINING,\u00a0PROJECT OF THE YEAR,\u00a0REHABILITATION US Pipelining LLC recently completed a major military project that included the cured-in-place-pipe (CIPP) rehabilitation of nearly 1,000 lf of 10-ft diameter storm water piping located beneath the airfield apron of the McGuire Air Force Base in Burlington, New Jersey. As confirmed through &hellip; <\/p>\n<p><a href=\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019<\/span> &rarr;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,10,6,2],"tags":[14],"class_list":["post-26","post","type-post","status-publish","format-standard","hentry","category-cured-in-place-pipelining","category-cured-in-place-pipelining-2","category-pipe-lining","category-pipeline-rehabilitation","tag-pipe-rehabilitation"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019 - US Pipelining, LLC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019 - US Pipelining, LLC\" \/>\n<meta property=\"og:description\" content=\"BY TRENCHLESS TECHNOLOGY STAFF ON OCTOBER 31, 2017PIPE RELINING,\u00a0PROJECT OF THE YEAR,\u00a0REHABILITATION US Pipelining LLC recently completed a major military project that included the cured-in-place-pipe (CIPP) rehabilitation of nearly 1,000 lf of 10-ft diameter storm water piping located beneath the airfield apron of the McGuire Air Force Base in Burlington, New Jersey. As confirmed through &hellip; Continue reading Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019 &rarr;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/\" \/>\n<meta property=\"og:site_name\" content=\"US Pipelining, LLC\" \/>\n<meta property=\"article:published_time\" content=\"2020-01-30T22:24:47+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-30T22:28:13+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg\" \/>\n<meta name=\"author\" content=\"uspipe\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"uspipe\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/\"},\"author\":{\"name\":\"uspipe\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c\"},\"headline\":\"Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019\",\"datePublished\":\"2020-01-30T22:24:47+00:00\",\"dateModified\":\"2020-01-30T22:28:13+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/\"},\"wordCount\":457,\"image\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg\",\"keywords\":[\"Pipe Rehabilitation\"],\"articleSection\":[\"Cured in place pipelining\",\"Cured-In-Place Pipelining\",\"pipe lining\",\"Pipeline Rehabilitation\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/\",\"url\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/\",\"name\":\"Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019 - US Pipelining, LLC\",\"isPartOf\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg\",\"datePublished\":\"2020-01-30T22:24:47+00:00\",\"dateModified\":\"2020-01-30T22:28:13+00:00\",\"author\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c\"},\"breadcrumb\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#primaryimage\",\"url\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg\",\"contentUrl\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/florida.uspipelining.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#website\",\"url\":\"https:\/\/florida.uspipelining.com\/blog\/\",\"name\":\"US Pipelining, LLC\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/florida.uspipelining.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c\",\"name\":\"uspipe\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g\",\"caption\":\"uspipe\"},\"url\":\"https:\/\/florida.uspipelining.com\/blog\/author\/uspipe\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019 - US Pipelining, LLC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/","og_locale":"en_US","og_type":"article","og_title":"Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019 - US Pipelining, LLC","og_description":"BY TRENCHLESS TECHNOLOGY STAFF ON OCTOBER 31, 2017PIPE RELINING,\u00a0PROJECT OF THE YEAR,\u00a0REHABILITATION US Pipelining LLC recently completed a major military project that included the cured-in-place-pipe (CIPP) rehabilitation of nearly 1,000 lf of 10-ft diameter storm water piping located beneath the airfield apron of the McGuire Air Force Base in Burlington, New Jersey. As confirmed through &hellip; Continue reading Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019 &rarr;","og_url":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/","og_site_name":"US Pipelining, LLC","article_published_time":"2020-01-30T22:24:47+00:00","article_modified_time":"2020-01-30T22:28:13+00:00","og_image":[{"url":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg","type":"","width":"","height":""}],"author":"uspipe","twitter_card":"summary_large_image","twitter_misc":{"Written by":"uspipe","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#article","isPartOf":{"@id":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/"},"author":{"name":"uspipe","@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c"},"headline":"Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019","datePublished":"2020-01-30T22:24:47+00:00","dateModified":"2020-01-30T22:28:13+00:00","mainEntityOfPage":{"@id":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/"},"wordCount":457,"image":{"@id":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#primaryimage"},"thumbnailUrl":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg","keywords":["Pipe Rehabilitation"],"articleSection":["Cured in place pipelining","Cured-In-Place Pipelining","pipe lining","Pipeline Rehabilitation"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/","url":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/","name":"Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019 - US Pipelining, LLC","isPartOf":{"@id":"https:\/\/florida.uspipelining.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#primaryimage"},"image":{"@id":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#primaryimage"},"thumbnailUrl":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg","datePublished":"2020-01-30T22:24:47+00:00","dateModified":"2020-01-30T22:28:13+00:00","author":{"@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c"},"breadcrumb":{"@id":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#primaryimage","url":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg","contentUrl":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/mcguire-afb-cipp-2.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/florida.uspipelining.com\/blog\/project-of-the-year-2017-rehabilitation-runner-up-mcguire-afb-largest-cipp-liner-ever-installed\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/florida.uspipelining.com\/blog\/"},{"@type":"ListItem","position":2,"name":"Project of the Year 2017 Rehabilitation Runner Up: McGuire AFB \u2018Largest CIPP Liner Ever Installed\u2019"}]},{"@type":"WebSite","@id":"https:\/\/florida.uspipelining.com\/blog\/#website","url":"https:\/\/florida.uspipelining.com\/blog\/","name":"US Pipelining, LLC","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/florida.uspipelining.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c","name":"uspipe","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g","caption":"uspipe"},"url":"https:\/\/florida.uspipelining.com\/blog\/author\/uspipe\/"}]}},"_links":{"self":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts\/26","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/comments?post=26"}],"version-history":[{"count":4,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts\/26\/revisions"}],"predecessor-version":[{"id":117,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts\/26\/revisions\/117"}],"wp:attachment":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/media?parent=26"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/categories?post=26"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/tags?post=26"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}