{"id":41,"date":"2020-01-30T22:19:08","date_gmt":"2020-01-30T22:19:08","guid":{"rendered":"http:\/\/www.uspipelining.com\/blog\/?p=41"},"modified":"2020-01-30T22:31:33","modified_gmt":"2020-01-30T22:31:33","slug":"us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project","status":"publish","type":"post","link":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/","title":{"rendered":"US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project"},"content":{"rendered":"<h3>McGuire AFB Airfield Infrastructure Project Said To Be Largest Of Its Kind<\/h3>\n<div class=\"mceTemp\"><\/div>\n<p><a href=\"http:\/\/uspipelining.com\/\">Philadelphia, PA \u2013 US Pipelining, LLC.,<\/a> an emerging leader in <a href=\"http:\/\/uspipelining.com\/cipp-cured-in-place-pipe-internal-pipe-repair\/\">Cured-In-Place-Pipelining solutions (CIPP)<\/a>, announced today the completion of a major military project which included the cured-in-place-pipe rehabilitation of nearly one thousand (1,000\u2019) linear feet of ten foot diameter (10\u2019) storm water piping located beneath the airfield apron of the McGuire Air Force Base in Burlington, NJ. The over-the-hole installation of 10\u2019 diameter CIPP liner is among the largest to have been successfully completed anywhere.<!--more--><\/p>\n<figure id=\"attachment_42\" aria-describedby=\"caption-attachment-42\" style=\"width: 207px\" class=\"wp-caption alignright\"><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-42\" src=\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg\" alt=\"McGuire AFB\" width=\"207\" height=\"272\" \/><figcaption id=\"caption-attachment-42\" class=\"wp-caption-text\">120\u2033 CIPP Liner McGuire AFBWe were able to achieve something that, to the best of our knowledge, has never be attempted, states Gary Horwedel, General Manager of US Pipelining<br \/>Philadelphia, PA (PRWEB) September 26, 2016<\/figcaption><\/figure>\n<p>Requiring more than a year of planning, sourcing, and logistics, the project involved support from the nation\u2019s premier suppliers to the industry. \u201cWorking with our resin supplier, AOC, and our liner manufacturer, Manufactured Technologies Corporation <a href=\"http:\/\/www.manufacturedtechnologies.com\/Company-Information\/Manufactured-Technologies\">(MTC)<\/a>, we were able to achieve something that, to the best of our knowledge, has never be attempted\u201d, states Gary Horwedel, General Manager of US Pipelining, who has been involved in infrastructure rehabilitation and repair using trenchless technologies for over 25 years. \u201cThis project involved infrastructure running beneath the airfield of an active Air Force base. The pipes were twenty-two feet below grade and measured 121\u201d inches around. The installation took place on the airfield, over-the-hole, and with military transport planes buzzing at our backs,\u201d says Horwedel. \u201cThis was an incredible achievement.\u201d<br \/>\n\u201cAs projects go, this was one of the more challenging with which we\u2019ve been involved\u201d, states Bill Moore,<a href=\"http:\/\/www.aoc-resins.com\/index.html\" target=\"_blank\" rel=\"noopener noreferrer\">AOC Product Leader-CIPP Resins<\/a>. \u201cOur team was engaged from day one as we worked through the selection and formulation of the resin in order to meet both environmental and engineering specifications. The sheer size of the liners being installed required six tankers carrying over 240,000 pounds of resin to be transported to the Base from our plant in Canada. The logistics and delivery of material was a critical component\u201d, said Moore.<br \/>\n\u201cAt 121 inches in diameter the liners were among the largest our facilities have manufactured,\u201d state\u2019s Mark Wetzel, Senior Director, MTC. \u201cOur design and manufacturing staff worked around the clock with the team at <a href=\"http:\/\/uspipelining.com\/\">US Pipelining<\/a> to ensure the liner materials and manufacturing specifications were met. This was a milestone for all involved.\u201d<br \/>\nSince entering the pipe rehabilitation industry 25 years ago, <a href=\"http:\/\/uspipelining.com\/\">US Pipelining<\/a> has gained recognition for their ability to offer highly specialized rehabilitation solutions to a vast array of clients including global Fortune 500 Companies, high-rise residential and commercial buildings and government agencies worldwide. A leader in CIPP trenchless technologies, US Pipelining continues to grow their <a href=\"http:\/\/uspipelining.com\/government\/\">government agencies portfolio<\/a> which includes the US Military, NASA, Fort Knox, Government of Mexico, Cayman Islands and numerous agencies throughout North America.<br \/>\nAbout Cured-In-Place technology: <a href=\"http:\/\/uspipelining.com\/pipelining-services\/\">Cured-In-Place Pipe technology (CIPP)<\/a> is one of several \u201cNo-Dig\u201d <a href=\"http:\/\/uspipelining.com\/pipelining-services\/\">trenchless rehabilitation methods<\/a> used to \u201cnoninvasively\u201d repair existing pipelines. CIPP is a jointless, seamless, pipe-within-a-pipe with the capability to structurally rehabilitate pipes ranging in diameter from 4\u2033\u2013120\u2033. With a design life of 50 years CIPP is one of the most widely used rehabilitation methods and has application in water, sewer, gas, and chemical pipelines.<br \/>\nAbout AOC Resins: AOC is a leading global supplier of resins, gel coats, colorants, additives and synergistic material systems for composites and cast polymers. <a href=\"http:\/\/www.aoc-resins.com\/index.html\">http:\/\/www.AOC-Resins.com<\/a><br \/>\nAbout MTC: <a href=\"http:\/\/www.aegion.com\/CompanyInformation\/About\/MTC\" target=\"_blank\" rel=\"noopener noreferrer\">Manufactured Technology Corporation<\/a>, formerly Mississippi Textiles Corporation, is a world leader in the design and manufacture of felt liner systems for the \u201cCured-In-Place-Pipe\u201d (CIPP) industry.<br \/>\n<a href=\"http:\/\/uspipelining.com\/company\/\">About US Pipelining:<\/a> USP is an industry leader specializing in trenchless pipe rehabilitation technologies including cured-in-place pipe (CIPP). With more than 25 years experiences US Pipelining serves Fortune 500 clients, municipalities, government agencies, refineries and commercial operations globally.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>McGuire AFB Airfield Infrastructure Project Said To Be Largest Of Its Kind Philadelphia, PA \u2013 US Pipelining, LLC., an emerging leader in Cured-In-Place-Pipelining solutions (CIPP), announced today the completion of a major military project which included the cured-in-place-pipe rehabilitation of nearly one thousand (1,000\u2019) linear feet of ten foot diameter (10\u2019) storm water piping located &hellip; <\/p>\n<p><a href=\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project<\/span> &rarr;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[4,5,10],"tags":[7],"class_list":["post-41","post","type-post","status-publish","format-standard","hentry","category-case-studies","category-cured-in-place-pipelining","category-cured-in-place-pipelining-2","tag-cipp-pipelining"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project - US Pipelining, LLC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project - US Pipelining, LLC\" \/>\n<meta property=\"og:description\" content=\"McGuire AFB Airfield Infrastructure Project Said To Be Largest Of Its Kind Philadelphia, PA \u2013 US Pipelining, LLC., an emerging leader in Cured-In-Place-Pipelining solutions (CIPP), announced today the completion of a major military project which included the cured-in-place-pipe rehabilitation of nearly one thousand (1,000\u2019) linear feet of ten foot diameter (10\u2019) storm water piping located &hellip; Continue reading US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project &rarr;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/\" \/>\n<meta property=\"og:site_name\" content=\"US Pipelining, LLC\" \/>\n<meta property=\"article:published_time\" content=\"2020-01-30T22:19:08+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-30T22:31:33+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg\" \/>\n<meta name=\"author\" content=\"uspipe\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"uspipe\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/\"},\"author\":{\"name\":\"uspipe\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c\"},\"headline\":\"US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project\",\"datePublished\":\"2020-01-30T22:19:08+00:00\",\"dateModified\":\"2020-01-30T22:31:33+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/\"},\"wordCount\":629,\"image\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg\",\"keywords\":[\"CIPP pipelining\"],\"articleSection\":[\"Case Studies\",\"Cured in place pipelining\",\"Cured-In-Place Pipelining\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/\",\"url\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/\",\"name\":\"US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project - US Pipelining, LLC\",\"isPartOf\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg\",\"datePublished\":\"2020-01-30T22:19:08+00:00\",\"dateModified\":\"2020-01-30T22:31:33+00:00\",\"author\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c\"},\"breadcrumb\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#primaryimage\",\"url\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg\",\"contentUrl\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/florida.uspipelining.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#website\",\"url\":\"https:\/\/florida.uspipelining.com\/blog\/\",\"name\":\"US Pipelining, LLC\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/florida.uspipelining.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c\",\"name\":\"uspipe\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g\",\"caption\":\"uspipe\"},\"url\":\"https:\/\/florida.uspipelining.com\/blog\/author\/uspipe\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project - US Pipelining, LLC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/","og_locale":"en_US","og_type":"article","og_title":"US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project - US Pipelining, LLC","og_description":"McGuire AFB Airfield Infrastructure Project Said To Be Largest Of Its Kind Philadelphia, PA \u2013 US Pipelining, LLC., an emerging leader in Cured-In-Place-Pipelining solutions (CIPP), announced today the completion of a major military project which included the cured-in-place-pipe rehabilitation of nearly one thousand (1,000\u2019) linear feet of ten foot diameter (10\u2019) storm water piping located &hellip; Continue reading US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project &rarr;","og_url":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/","og_site_name":"US Pipelining, LLC","article_published_time":"2020-01-30T22:19:08+00:00","article_modified_time":"2020-01-30T22:31:33+00:00","og_image":[{"url":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg","type":"","width":"","height":""}],"author":"uspipe","twitter_card":"summary_large_image","twitter_misc":{"Written by":"uspipe","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#article","isPartOf":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/"},"author":{"name":"uspipe","@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c"},"headline":"US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project","datePublished":"2020-01-30T22:19:08+00:00","dateModified":"2020-01-30T22:31:33+00:00","mainEntityOfPage":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/"},"wordCount":629,"image":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#primaryimage"},"thumbnailUrl":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg","keywords":["CIPP pipelining"],"articleSection":["Case Studies","Cured in place pipelining","Cured-In-Place Pipelining"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/","url":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/","name":"US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project - US Pipelining, LLC","isPartOf":{"@id":"https:\/\/florida.uspipelining.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#primaryimage"},"image":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#primaryimage"},"thumbnailUrl":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg","datePublished":"2020-01-30T22:19:08+00:00","dateModified":"2020-01-30T22:31:33+00:00","author":{"@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c"},"breadcrumb":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#primaryimage","url":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg","contentUrl":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/120cippMcGuire.jpg"},{"@type":"BreadcrumbList","@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-major-military-cipp-pipe-lining-rehabilitation-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/florida.uspipelining.com\/blog\/"},{"@type":"ListItem","position":2,"name":"US Pipelining, LLC Completes Major Military CIPP Pipe Lining Rehabilitation Project"}]},{"@type":"WebSite","@id":"https:\/\/florida.uspipelining.com\/blog\/#website","url":"https:\/\/florida.uspipelining.com\/blog\/","name":"US Pipelining, LLC","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/florida.uspipelining.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c","name":"uspipe","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g","caption":"uspipe"},"url":"https:\/\/florida.uspipelining.com\/blog\/author\/uspipe\/"}]}},"_links":{"self":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts\/41","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/comments?post=41"}],"version-history":[{"count":3,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts\/41\/revisions"}],"predecessor-version":[{"id":55,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts\/41\/revisions\/55"}],"wp:attachment":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/media?parent=41"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/categories?post=41"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/tags?post=41"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}