{"id":61,"date":"2020-01-30T22:17:36","date_gmt":"2020-01-30T22:17:36","guid":{"rendered":"http:\/\/www.uspipelining.com\/blog\/?p=61"},"modified":"2020-01-30T22:34:03","modified_gmt":"2020-01-30T22:34:03","slug":"us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project","status":"publish","type":"post","link":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/","title":{"rendered":"US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project"},"content":{"rendered":"<h3 class=\"article-title\">One of Nation\u2019s Most Distinguished Military Landmarks Receives Benefits from Trenchless CIPP Rehabilitation<\/h3>\n<p class=\"article-date\">PHILADELPHIA, PA (PRWEB)\u00a0JUNE 07, 2017<\/p>\n<p class=\"responsiveNews\"><a title=\"visit website\" href=\"http:\/\/uspipelining.com\/\" rel=\"nofollow\"><img loading=\"lazy\" decoding=\"async\" class=\"alignright size-full wp-image-64\" src=\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png\" alt=\"\" width=\"250\" height=\"185\" \/>US Pipelining, LLC.<\/a>, an emerging leader in\u00a0<a title=\"cured-in-place-pipe\" href=\"http:\/\/uspipelining.com\/cipp-cured-in-place-pipe-internal-pipe-repair\/\" rel=\"nofollow\">Cured-In-Place-Pipelining solutions (CIPP)<\/a>, announced today the completion of a military project which included cured-in-place-pipe rehabilitation at the Fort Lesley J. McNair Army Post in Washington, DC. Fort McNair, a part of the Joint Base Myer-Henderson Hall, is the headquarters of the Army\u2019s Military District of Washington and home of the National Defense University, as well as the official residence of the US Army\u2019s vice chief of staff.<!--more--><\/p>\n<p class=\"responsiveNews\">The CIPP rehabilitation involving a large diameter storm culvert running beneath the military facility and draining to the Potomac River was part of a larger infrastructure project directed by the\u00a0<a title=\"visit website\" href=\"http:\/\/www.usace.army.mil\/\" target=\"_blank\" rel=\"nofollow noopener noreferrer\">U.S Army Corp of Engineers (USACE)<\/a>\u00a0and ACS Construction (formerly Akima Construction Services).<\/p>\n<p class=\"responsiveNews\">\u201cThis was a tidal line which means it was sensitive to the tidal flows of the Potomac River\u201d states Jeremy Bowman, President, US Pipelining. \u201cAs such, special planning and logistics were required to isolate the 48\u201d diameter line. Working with the team at ACS, the dewatering and construction phases were successfully completed without issue,\u201d said Bowman.<\/p>\n<p class=\"responsiveNews\">A leader in\u00a0<a title=\"see industrial\" href=\"http:\/\/uspipelining.com\/industrial\/\" rel=\"nofollow\">Cured-In-Place-Pipe (CIPP) technologies for industrial<\/a>,\u00a0<a title=\"commercial services\" href=\"http:\/\/uspipelining.com\/commercial\/\" rel=\"nofollow\">commercial<\/a>\u00a0and municipal applications, US Pipelining\u2019s military and government portfolio includes projects for The Smithsonian, Fort Knox, NASA, McGuire AFB, Lakehurst Naval Air Station, National Park Services, and the Naval Air Station Patuxent River.<\/p>\n<p class=\"responsiveNews\">\u201cCured-In-Place-Pipe lining has become a widely used and accepted technology globally as a low-cost alternative to traditional trench and replace methods, \u201csaid Bowman. \u201cIndustry can either close down operations, interrupt traffic flow to dig and replace failing infrastructure or, option a non-invasive rehabilitation process which rehabilitates the failed pipe from the inside out without the need for excavation. Companies and municipalities worldwide are now opting for a faster, more cost-effective means of rehabilitation. That is our cured-in-place (CIPP) technology.\u201d<\/p>\n<p class=\"responsiveNews\">Since entering the pipe rehabilitation industry 25 years ago, US Pipelining has gained recognition for their ability to offer highly specialized rehabilitation solutions to a vast array of clients including global fortune 500 companies, high-rise residential and commercial buildings and government agencies. \u201cUS Pipelining is one of a handful of companies globally who provide CIPP technology for pipes ranging in diameter from 4 inches to 120 inches,\u201d states Bowman. \u201cThere are very few conditions we have not seen or reconciled.\u201d<\/p>\n<p class=\"responsiveNews\">About Cured-In-Place technology: Cured-In-Place Pipe technology (CIPP) is one of several\u00a0<a title=\"trenchless pipe lining\" href=\"http:\/\/uspipelining.com\/pipelining-services\/\" rel=\"nofollow\">\u201cNo-Dig\u201d trenchless rehabilitation methods<\/a>used to \u201cnon-invasively\u201d repair existing pipelines. CIPP is a joint-less, seamless, pipe-within-a-pipe with the capability to structurally rehabilitate pipes ranging in diameter from 4\u2033\u2013120\u2033. With a design life of 50 years CIPP is one of the most widely used rehabilitation methods and has application in water, sewer, gas, and chemical pipelines.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>One of Nation\u2019s Most Distinguished Military Landmarks Receives Benefits from Trenchless CIPP Rehabilitation PHILADELPHIA, PA (PRWEB)\u00a0JUNE 07, 2017 US Pipelining, LLC., an emerging leader in\u00a0Cured-In-Place-Pipelining solutions (CIPP), announced today the completion of a military project which included cured-in-place-pipe rehabilitation at the Fort Lesley J. McNair Army Post in Washington, DC. Fort McNair, a part of &hellip; <\/p>\n<p><a href=\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/\" class=\"more-link\">Continue reading <span class=\"screen-reader-text\">US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project<\/span> &rarr;<\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[5,6,9],"tags":[16],"class_list":["post-61","post","type-post","status-publish","format-standard","hentry","category-cured-in-place-pipelining","category-pipe-lining","category-trenchless-cipp-rehabilitation","tag-cured-in-place-pipelining"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v26.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project - US Pipelining, LLC<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project - US Pipelining, LLC\" \/>\n<meta property=\"og:description\" content=\"One of Nation\u2019s Most Distinguished Military Landmarks Receives Benefits from Trenchless CIPP Rehabilitation PHILADELPHIA, PA (PRWEB)\u00a0JUNE 07, 2017 US Pipelining, LLC., an emerging leader in\u00a0Cured-In-Place-Pipelining solutions (CIPP), announced today the completion of a military project which included cured-in-place-pipe rehabilitation at the Fort Lesley J. McNair Army Post in Washington, DC. Fort McNair, a part of &hellip; Continue reading US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project &rarr;\" \/>\n<meta property=\"og:url\" content=\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/\" \/>\n<meta property=\"og:site_name\" content=\"US Pipelining, LLC\" \/>\n<meta property=\"article:published_time\" content=\"2020-01-30T22:17:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-30T22:34:03+00:00\" \/>\n<meta property=\"og:image\" content=\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png\" \/>\n<meta name=\"author\" content=\"uspipe\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"uspipe\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#article\",\"isPartOf\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/\"},\"author\":{\"name\":\"uspipe\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c\"},\"headline\":\"US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project\",\"datePublished\":\"2020-01-30T22:17:36+00:00\",\"dateModified\":\"2020-01-30T22:34:03+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/\"},\"wordCount\":467,\"image\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png\",\"keywords\":[\"Cured-In-Place Pipelining\"],\"articleSection\":[\"Cured in place pipelining\",\"pipe lining\",\"Trenchless CIPP Rehabilitation\"],\"inLanguage\":\"en-US\"},{\"@type\":\"WebPage\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/\",\"url\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/\",\"name\":\"US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project - US Pipelining, LLC\",\"isPartOf\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#primaryimage\"},\"image\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#primaryimage\"},\"thumbnailUrl\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png\",\"datePublished\":\"2020-01-30T22:17:36+00:00\",\"dateModified\":\"2020-01-30T22:34:03+00:00\",\"author\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c\"},\"breadcrumb\":{\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#primaryimage\",\"url\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png\",\"contentUrl\":\"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/florida.uspipelining.com\/blog\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#website\",\"url\":\"https:\/\/florida.uspipelining.com\/blog\/\",\"name\":\"US Pipelining, LLC\",\"description\":\"Just another WordPress site\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/florida.uspipelining.com\/blog\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c\",\"name\":\"uspipe\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g\",\"caption\":\"uspipe\"},\"url\":\"https:\/\/florida.uspipelining.com\/blog\/author\/uspipe\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project - US Pipelining, LLC","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/","og_locale":"en_US","og_type":"article","og_title":"US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project - US Pipelining, LLC","og_description":"One of Nation\u2019s Most Distinguished Military Landmarks Receives Benefits from Trenchless CIPP Rehabilitation PHILADELPHIA, PA (PRWEB)\u00a0JUNE 07, 2017 US Pipelining, LLC., an emerging leader in\u00a0Cured-In-Place-Pipelining solutions (CIPP), announced today the completion of a military project which included cured-in-place-pipe rehabilitation at the Fort Lesley J. McNair Army Post in Washington, DC. Fort McNair, a part of &hellip; Continue reading US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project &rarr;","og_url":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/","og_site_name":"US Pipelining, LLC","article_published_time":"2020-01-30T22:17:36+00:00","article_modified_time":"2020-01-30T22:34:03+00:00","og_image":[{"url":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png","type":"","width":"","height":""}],"author":"uspipe","twitter_card":"summary_large_image","twitter_misc":{"Written by":"uspipe","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#article","isPartOf":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/"},"author":{"name":"uspipe","@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c"},"headline":"US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project","datePublished":"2020-01-30T22:17:36+00:00","dateModified":"2020-01-30T22:34:03+00:00","mainEntityOfPage":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/"},"wordCount":467,"image":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#primaryimage"},"thumbnailUrl":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png","keywords":["Cured-In-Place Pipelining"],"articleSection":["Cured in place pipelining","pipe lining","Trenchless CIPP Rehabilitation"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/","url":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/","name":"US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project - US Pipelining, LLC","isPartOf":{"@id":"https:\/\/florida.uspipelining.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#primaryimage"},"image":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#primaryimage"},"thumbnailUrl":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png","datePublished":"2020-01-30T22:17:36+00:00","dateModified":"2020-01-30T22:34:03+00:00","author":{"@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c"},"breadcrumb":{"@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#primaryimage","url":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png","contentUrl":"http:\/\/www.uspipelining.com\/blog\/wp-content\/uploads\/2020\/01\/gI_63844_McNair-Pic-2-1.png"},{"@type":"BreadcrumbList","@id":"https:\/\/florida.uspipelining.com\/blog\/us-pipelining-llc-completes-u-s-military-infrastructure-cured-in-place-pipe-cipp-pipe-lining-project\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/florida.uspipelining.com\/blog\/"},{"@type":"ListItem","position":2,"name":"US Pipelining, LLC Completes U.S Military Infrastructure Cured-In-Place-Pipe (CIPP) Pipe Lining Project"}]},{"@type":"WebSite","@id":"https:\/\/florida.uspipelining.com\/blog\/#website","url":"https:\/\/florida.uspipelining.com\/blog\/","name":"US Pipelining, LLC","description":"Just another WordPress site","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/florida.uspipelining.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/e6513d36521da1c6471ff10b23636d1c","name":"uspipe","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/florida.uspipelining.com\/blog\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/b44b97cf3e3d6eebbb1edd42935c9d2eb12058ef57adbc487f37f43e673686de?s=96&d=mm&r=g","caption":"uspipe"},"url":"https:\/\/florida.uspipelining.com\/blog\/author\/uspipe\/"}]}},"_links":{"self":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts\/61","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/comments?post=61"}],"version-history":[{"count":2,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts\/61\/revisions"}],"predecessor-version":[{"id":65,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/posts\/61\/revisions\/65"}],"wp:attachment":[{"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/media?parent=61"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/categories?post=61"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/florida.uspipelining.com\/blog\/wp-json\/wp\/v2\/tags?post=61"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}